ISO/IEC/IEEE 15288: A Guide to the Systems Engineering Lifecycle
A defense program contracts three suppliers before holding its Preliminary Design Review (PDR). Six months into development, each supplier has interpreted the system requirements differently because no authoritative baseline existed when contracts were signed. The integration milestone becomes a discovery event, revealing interface conflicts that trace back to requirements the teams never reconciled. This retroactive […]